Brammerton Street, Chelsea

This three-storey house was refurbished throughout. The whole basement was tanked and damp-proofed internally and externally, and then reconfigured into a spacious kitchen and snug area, with a mini-gym, and walk-through shower. New glossy 600 x 600 porcelain tiles were fitted on top of under-floor heating elements and Wedi floor insulation.

The period staircase were straightened and strengthened, along with the supporting floor joists and landings. The original handrail was retained and sanded back and re-glossed.

The ground floor-lounge was stripped back and re-skimmed, and the original cornices were repaired. New radiators and two new gas fireplaces were fitted.

A window was replaced with new french doors, opening on to a small balcony.

A new cloakroom and laundry-room were fitted with tall units to house the new boiler and to provide extra storage. New plumbing and electrics were fitted throughout and the original sash windows were refurbished and draughtproofed.

The top floor bathroom was stripped out and re-fitted and the bedrooms and stairwell were stripped back and re-skimmed. The roof was repaired and the whole house was decorated externally and internally.


Click on the thumbnail to enlarge.